School Construction Starts
The engineering team, led by Agali, starts construction on the school in Sebeun Tabema after $35,000 has been raised out of the $70,000 total needed.
The engineering team, led by Agali, starts construction on the school in Sebeun Tabema after $35,000 has been raised out of the $70,000 total needed.